The second special equipment supervision and inspection agencies (hereinafter referred to as inspection bodies) to carry out acceptance testing of lifting appliances and periodic inspection must comply with the regulations prescribed test content and test methods. Such as the use of this procedure is inconsistent with the test method shall be subject to State Administration of Quality Supervision, Inspection and Quarantine special equipment safety supervision agencies agreed. The order applies bridge cranes, tower cranes, mobile cranes and portal cranes (hereinafter referred to as cranes) acceptance testing and periodic inspection.
Article installation, repair, or modification to be put into use after the crane shall be tested in accordance with the provisions of the regulations on the content of the acceptance tests; in this regulation shall be in accordance with a crane on the periodic inspection requirement, an inspection every two years. Case may affect their safety and technical performance of natural disasters or accidents occurring after the crane equipment, as well as re-use more than one year to stop using cranes for equipment overhaul, inspection requirements shall be in accordance with the acceptance inspection.
Article IV of the rules and requirements of the main technical indicators cited "crane safety regulations" (GB6067-1985), "Crane design specifications" (GB/T3811-1983) and various types of cranes relevant national standards. Relevant standards are revised as described above, should be based on the latest standards prevail.
Article inspection agency shall develop in accordance with the procedures, including inspection procedures, including inspection and testing flowchart implementation details, and the implementation of strict control of the inspection process. Inspectors during the inspection, such as unusual or special circumstances, consult an authorized inspection agency, in accordance with the relevant national standards to increase test items. Conditions that do not have on-site inspection of the crane, or continue testing may cause safety and health damage, may terminate the test and inspection personnel must explain the reasons in writing.
Article VI inspection agency should install, repair, or modification and other construction units on the basis of self-qualified acceptance testing. Self-construction unit content, requirements and methods shall comply with relevant regulations and standards, and shall issue a complete self-test report.
Article engaged crane acceptance testing, periodic testing of the units shall be equipped with at least a "crane Supervision, Inspection and necessary equipment Table" inspection and testing equipment, measuring instruments and the corresponding detection tool, its accuracy shall meet the "essential equipment Device Table "on request, are legal metrology areas, must be qualified by the test, and in the period.
Article VIII-the-spot inspection tests shall meet the following conditions:
1 was seized equipment status, testing on-site environmental and site conditions comply with the relevant standards and specification requirements;
(2) test site should be clean and should not affect the crane inspection items, inspection facilities and has nothing to do with the personnel, and ongoing field tests indicate place warning signs.
Article IX inspectors must follow the "Boiler and Pressure Vessel and Pressure Piping and special equipment inspection personnel qualification examination rules" requirements, to obtain the provincial quality and technical supervision administration issued qualification certificates before engaging in supervision and inspection of the crane. Site inspection by at least two more with crane inspectors qualified personnel and inspection personnel qualification certificate must wear badges.
Article crane inspected units and installation, alteration (overhaul) and maintenance and other related units, inspection agency shall provide relevant technical information and arrange with the relevant professionals to the site inspection.
Article XI crane acceptance testing and periodic inspection of the project, not less than "acceptance inspection reports and crane crane periodic inspection report (form)" listed in the project, the specific content of the test, shall be in accordance with the requirements and methods, "Crane Supervision, Inspection and content requirements and Methods "provisions implemented.
Article XII-site inspection and testing process, the inspectors shall be recorded in detail. Site inspection original records (hereinafter referred to as the original record), it should be a detailed record of each project testing conditions and test results. Original recordings by the inspection agency to develop a unified form, in use after the official release of the unit.
Article XIII shall not be less than the contents of the original record "test content and method" provides the content, and should facilitate on-site operation records and the "Inspection Report" to fill, individual projects shall also list format or drawings to facilitate on-site records.
Article XIV original records may be used under a unified simple tag, indicating that the "qualified", "fail", "N" and so on. With test data requirements of the project should fill in the measured data; no test data requirements but need to explain the project, you can simply text description field test conditions; special circumstances, they can complete "because of ...... (reason) is not seized," "to be inspection "," see attached "and so on.
Article XV of the original records should be signed by the inspectors and inspection dates and personnel should have checked checked signature.
Article XVI after completion of the inspection, inspection bodies must be within 10 working days, according to the original record of the data and results, fill in the units issued to subjects' inspection reports. " "Inspection Report" content, format shall conform to the requirements of this regulation, the conclusion must have a test page, reviewed, approved and signed by the person examination agencies seal or official seal.
Article XVII "inspection report" with test data requirements of the project, should be in the "test results" column or fill measured by the statistics, calculate the processed data; no test data requirements but need instructions or special circumstances items , in the "test results" column concise description; that no test data nor to explain the situation, in the "test results" column fill in the "in line", "/" (N) or " accord. " "Conclusion" column fill only "qualified", "fail", "/" (N) and other individual conclusions.
Article XVIII crane acceptance testing and periodic inspection of the determination conditions were as follows:
1. Acceptance inspection judgment condition: Important Project ("Inspection Report" projects marked with ※, the same below) all qualified, general project ("Inspection Report" is not marked with ※ project, the same below) unqualified no more than 3 items (including 3) and satisfies the requirements of paragraph 3, it can be considered in compliance.
(2) determine the conditions for periodic inspection: Important items are all qualified, general project failure is not more than 5 (including 5) and satisfies the requirements of paragraph 3, it can be considered in compliance.
3 of the above two conditions, but not exceeding the permitted number of entries unqualified general items, inspection agency shall issue a rectification notice, proposed rectification requirements. Only in the rectification is completed and confirmed by qualified inspectors, or the use of units have taken appropriate security measures and rectification report signed guardianship views used only after the issue concluded that "qualified" or "re-examination qualified "" inspection report. " Where more than qualified to determine the unqualified term conditions are judged to be "qualified" or "unqualified re-examination" and issued the corresponding results of the "inspection report." Determined to be "unqualified" or "re-examination unqualified" crane, construction or repair unit may apply to re-examination.
Article XIX "inspection report" only allows the use of "pass", "fail", "re-examination", "recheck unqualified" four kinds of conclusions of the examination. Fill conditions which are as follows:
1 satisfy the conditions of Article XVIII qualified determination cranes, conclusions of the examination fill in the "qualified";
(2) does not satisfy the conditions of Article XVIII qualified determination cranes, conclusions of the examination fill out the "unqualified";
3 After retesting qualified determination to meet the conditions of Article XVIII cranes, conclusions of the examination fill out the "re-examination";
4 is still not satisfied after retesting qualified to determine the conditions of Article XVIII of the crane, conclusions of the examination fill out the "re-examination failed."
Article XX judged to be "substandard" or "re-examination unqualified" crane inspection agency inspection results should be reported to the local quality and technical supervision administration of special equipment safety supervision institutions in order to take timely safety monitoring measures.
Twenty-one on-site inspection, the inspector shall be provided with and wear inspection tasks necessary personal protective equipment.
Twenty-two inspection bodies must be responsible for the quality inspection work. Inspection errors caused due to an accident or violation of the rules of order, according to the "Special Equipment Safety Supervision Administration of Quality Supervision and regulations" and other relevant provisions of the accountability and responsibility of the parties inspection bodies.
Article 23 of the regulation by the State General Administration of Quality Supervision, Inspection and Quarantine of special equipment safety supervision mechanism responsible for the interpretation.
Article 24 of the regulation since November 1, 2002 into effect.