No. |
Safety device name |
Bridge crane |
Gantry crane |
Loading bridge |
1 |
Overload limiter |
Starting weight> 20t must be installed |
Starting weight> 10t must be installed |
Should be installed |
3 ~ 20t lifting capacity must be installed |
3 ~ 10t lifting capacity must be installed |
|||
2 |
Up limit position limiter |
Power-driven should be installed |
Power-driven should be installed |
Should be installed |
3 |
Down limit position limiter |
Power-driven adapted to be attached |
Power-driven adapted to be attached |
Should be installed |
4 |
Movement limit position limiter |
Power-driven in carts and trolleys run limit position should be installed |
||
5 |
Chain protection |
① should be installed |
① should be installed |
② should be installed |
6 |
Buffer |
Should be installed |
Should be installed |
Should be installed |
7 |
Rail clamp anchoring device |
Outdoor work shall be installed |
Outdoor work shall be installed |
Outdoor work shall be installed |
8 |
Boarding signal button |
There should be mounted cab |
There should be mounted cab |
Cab should be installed in the moving part |
9 |
Anti-rollover safety hook |
Single main beam and the main beam side should be installed off the hook |
|
|
10 |
Maintenance hoists |
Should be installed |
Should be installed |
Should be installed |
11 |
Sweep rails and supporting frame |
Should be installed |
Should be installed |
Should be installed |
12 |
Track plate end stop |
Should be installed |
Should be installed |
Should be installed |
13 |
Slip line shield |
Should be installed |
|
|
14 |
Exposed moving parts shields |
Should be installed |
Should be installed |
Should be installed |
15 |
Electrical Equipment Covers |
Outdoor work shall be installed |
Outdoor work shall be installed |
Outdoor work shall be installed |
Note:
① For the bridge crane, crane from the building board between the door and the traveling mechanism; boarded by the cab door hatch bridge and trolley run institutions; located in the sports section of the cab into the cab openings and trolley run institutions, should be installed interlock protection.